Alta Refrigeration

Tiernan & Patrylo was selected by Alta Refrigeration to design and build an expansion to their modular industrial freezer manufacturing facility. In addition, Tiernan & Patrylo completed a hydrology study and revised the master storm water detention system for the 2.14 acre site. This included the addition of an underground system, totaling 17,175 cubic feet of storage for water quality treatment and stormwater detention (i.e., flood control).

Site improvements also included new fire water lines as well as the demolition and replacement of approximately 80,000 square feet of heavy duty concrete paving. The fabrication shop addition included an extra energy efficient roof and prefabricated foam wall panels. A heavy duty double girder, top running overhead bridge crane with two 7.5 ton capacity hoists was also provided as a part of the project.

Client: Alta Refrigeration
Project Size: 12,000 square feet | $1.9M
Schedule: 4 months construction duration